Capital Efficiency Plan™ for Avon, MA
Tata & Howard recently completed a Capital Efficiency Plan™ for the Town of Avon, MA. As part of the project, Tata & Howard updated and verified the Town’s existing hydraulic model. The work included the completion of fire flow tests throughout the Town and allocation of demands using up-to-date billing and parcel data. The Capital Efficiency Plan™ identified and prioritized areas for improvement within the distribution system.
Our services included evaluating the condition of the existing distribution system infrastructure to determine the adequacy of meeting present and future demands, assessing and prioritizing system improvements, reviewing and evaluating typical fire flows throughout the system, creating a pipe asset management rating system, and recommending improvements to the distribution system. Recommendations included installation of two replacement wells, conducting an interconnection study, rehabilitation of the Page Street Tank, and phased distribution system improvements.
The hydraulic model was also verified under an Extended Period Simulation (EPS), which considers changes in the distribution system over time. The EPS will be used to evaluate tank operating ranges and modifications to the well operating conditions.