Great Hill Water Tank Construction, Marion, Massachusetts
This project included construction of a 1.0 million gallon, precast, pre-stressed, wire wound, concrete water storage tank in Marion, Massachusetts, with associated piping and appurtenances, a Tideflex mixing system, and site work. Other work included the decommissioning and demolition of the existing 2.0 million gallon pre-stressed concrete water storage tank at the project site. All work was completed ahead of the August 30, 2015 deadline.
![Prepared tank sub-grade](http://tataandhoward.com/wp-content/uploads/2015/07/DSCN1090-1024x768.jpg)
![Completed leveling base for tank](http://tataandhoward.com/wp-content/uploads/2015/07/DSCN1149-1024x768.jpg)
![Tank floor/footing reinforcing steel and seismic cables prior to concrete pour](http://tataandhoward.com/wp-content/uploads/2015/07/DSCN1491-1024x768.jpg)
![Completed tank floor/footing](http://tataandhoward.com/wp-content/uploads/2015/07/DSCN1533-1024x768.jpg)
![Finished tank](http://tataandhoward.com/wp-content/uploads/2015/07/MarionMA-GreatHill-Tank-5-27-16-1024x768.jpg)