New Hampton Road Water Main Project

Tata & Howard recently completed design, funding, and construction phase services in the City of Franklin, NH for the $3.5M New Hampton Road Water Main Project. The new 16-inch and 12-inch ductile iron water mains replaced a 1940’s era unlined cast iron water main (approximately 14,000 linear feet) with a history of main breaks and extends over three (3) miles from the Babbitt Road Booster Station to the Sanbornton Wellfield.

The water main was identified as a priority in the 2016 Capital Efficiency Plan prepared by Tata & Howard and will provide improved water quality, distribution pressure, and fire protection.

Tata & Howard assisted the City with maximizing the NHDES SRF Loan with the City’s paving program funds to fully reconstruct 9,000 linear feet of New Hampton Road as part of the project.

Park Construction Company of Fitzwilliam, NH was the General Contractor for the project which was initiated in March and completed on time in November of 2020 following all recommended Covid-19 protocols.