Ryan Neyland, P.E., Project Manager, presented this webinar on Horizontal Direction Drilling of Raw Water Intakes into Long Pond, Falmouth MA. Regulatory and customer-based drivers led the Falmouth Water Department to construct a new water treatment plant (WTP) at Long Pond. Due to the location of the new WTP in relation to the existing pump station facility and intake, new intakes and a raw water pump station were needed to pump water from Long Pond to the WTP. This presentation will discuss pipe and screen installation utilizing horizontal directional drilling methods to minimize any potential impacts to the pond during construction.