Search Results for: pump station
Steele Street Pump Station, New Britain, CT
Tata & Howard provided engineering services for modifications to the Steele Street Pump Station including installation of a new constant-run type pump station with variable frequency drives; and design and … Continue reading Steele Street Pump Station, New Britain, CT
Combined Pump Station Chemical Feed Building
Rulindo and the Pump Station with a View
James’ Rwanda Impact Tour JournalWater for People Impact Tour Rwanda 2019James Hoyt, P.E. Day 3 The partnerships and cooperative spirit of the Water for People Everyone Forever model was on … Continue reading Rulindo and the Pump Station with a View
Trinity Avenue Pump Station, Grafton, MA
Tata & Howard is providing engineering services to the Grafton Water District for the Trinity Avenue Pump Station at the Trinity Avenue Wellfield. The project included permitting, design, and bidding … Continue reading Trinity Avenue Pump Station, Grafton, MA
Trinity Ave. Chemical Feed Pump Station, Grafton, MA
Tata & Howard provided engineering services for permitting, design, and bidding of the 1.3 mgd chemical injection Trinity Avenue Pump Station at the Trinity Avenue Wellfield. The project included an … Continue reading Trinity Ave. Chemical Feed Pump Station, Grafton, MA
Maine Water Company Pump Station
Tata & Howard assisted Maine Water Company with mechanical, structural, and architectural design of a new high service zone booster pump station on Barra Road within the Biddeford-Saco water distribution … Continue reading Maine Water Company Pump Station
Wastewater Pump Stations, Auburn, MA
CLIENT: Town of Auburn, Massachusetts Department of Public Works PROJECT: Replacement of three existing wastewater pump stations THE CHALLENGE: The sites were very small and restricted with high groundwater levels, and there were adjacent wetlands … Continue reading Wastewater Pump Stations, Auburn, MA
Pump Stations, Wastewater Treatment Facility, and Force Main Design and Construction, Troy and Jay, VT
Tata & Howard provided engineering services for the evaluation, design, and construction of approximately five miles of pressure and gravity sewer to serve the mountain resort community of Jay, Vermont. … Continue reading Pump Stations, Wastewater Treatment Facility, and Force Main Design and Construction, Troy and Jay, VT
Progressive Cavity Pump Stations, Ludlow, VT
Tata & Howard team members designed two high head progressive cavity pump stations for the Jackson Gore expansion project at Okemo Mountain. Each pump station was designed to fit in … Continue reading Progressive Cavity Pump Stations, Ludlow, VT
Industrial Park Interceptor Sewer and Pump Station, Medway, MA
Tata & Howard conducted an alternatives analysis for the collection and disposal of the 80,000 gpd of wastewater anticipated from the Medway Industrial Park at full build out. The study … Continue reading Industrial Park Interceptor Sewer and Pump Station, Medway, MA